ID-439: Commercial Design I
Spring 12 |
| |
|
|
Jan. |
18 |
|
|
|
|
|
|
|
|
|
|
| |
|
Codes Assignment - Visual Guide to Building Codes Due March 7 |
| |
|
Homework: Read Chapter 1, 2 and 10 - Harmon Book |
| |
|
|
|
23 |
DISC Workshop (10 points) |
| |
|
Heather Esposito, IIDA Industry, LEED AP, Teknion Representative |
| |
|
|
|
25 |
Lecture: Intro to Codes, Regulations & Standards; Codes Process (Chapter 1 & 10) |
| |
|
Lecture: Occupancy Classifications and Loads (Chapter 2) |
|
|
In Class Assignment: Page 46 Calculating Occupancy Loads (5 pts) |
|
|
Homework Assignment: Read Chapter 4 - Harmon Book |
| |
|
Homework Assignment: Page 48 & 49 of Code Exercises |
|
|
|
| |
30 |
Review Homework: Codes Exercises Pages 48 &49 (5 pts) |
|
|
Lecture: Means of Egress |
| |
|
Homework Assignment: Page 53-59 of Code Exercises Due Feb. 6th |
| |
|
|
February |
1 |
Lecture: ADA/ABA |
|
|
Bring adhesive tab dividers and ADA Book to class |
| |
|
Homework Assignment: Read Chapter 5 - Harmon Book and finish Code Exercises 53-59 |
| |
|
|
| |
6 |
Review homework exercises 53-59 on egress (5 pts) |
| |
|
Complete ADA Lecture- Bring ADAAG book |
| |
|
Lecture: Fires Resistent Materials and Assemblies |
|
|
Lecture: Fire Protection Systems, Plumbing and Mechancial Codes |
|
|
Homework Assignment: Read Chapter 9 and conduct team ADA assessment of the KHH |
| |
|
|
| |
8 |
Lecutre: Fire Codes: FF&E and Testing (ACT) |
| |
|
In Class Assignment: What's wrong with this plan? (5 pts) |
| |
|
Homework Due: KHH Team ADA Assessment: (15 pts) |
| |
|
Homework Assignment: Code Exercises: pages 60/61, 65/66 & 70-73 |
| |
|
|
| |
13 |
Review code homework pages 60/61, 65/66 & 70-73 (5 pts) |
| |
|
Review Design Project Programming Document |
| |
|
Team 1 Team 2 Team 3 |
| |
|
Lecture: Schematic Design and Space Typicals |
| |
|
Lecture: Commercial Furniture and Systems Furniture |
| |
|
Homework Assignment: Begin Pre-Design Phase- Due Feb. 24 |
| |
|
|
| |
15 |
Lecture: Raised Flooring Systems |
| |
|
In Class: Schematic Space Planning (5 pts) |
| |
|
In Class: Raised Flooring Exercise (5 pts) |
| |
|
Studio Time: Continue working on pre-design phase of project (Bring markers and trash paper to next class) |
| |
|
|
| |
20 |
Mardi Gras Holiday - No Class |
| |
|
|
| |
22 |
ADA Workshop in Pearl MS Leave at 6:30 a.m. |
| |
|
Assignment: Bubble Diagram - presentation quality (5 pts) |
| |
|
Studio Time: Continue working on programming and schematic phase of project |
| |
|
|
| |
24 |
Field Trip to Jackson - leave@ 7:30 a.m. (20 points) Directions |
| |
|
10:00 Business Interiors: 146 Market Ridge, Ridgeland, MS |
| |
|
11:30 MS Museum of Art- Knoll tour (Interior Elements) |
| |
|
1:30 Barefield Workplace Solutions: 251 W. South Street |
| |
|
2:45 Canazaro Cawthon and Davis Architects |
| |
24 |
Homework Due: Pre-Design Phase (50 points) |
| |
|
|
| |
27 |
Review for Exam 1 |
| |
|
In class Assignment: Codes Overview (5 pts) |
| |
|
Return Pre-Design Phase and review in class: |
| |
|
Check 1: 3 block plans Knight Abby CAD file |
| |
|
|
| |
29 |
Exam 1: Covers Codes and ADA (100 points) |
| |
|
(bring Codes book, notes and ADA book to class) |
| |
|
Check 2: Preliminary Floor Plan on trash paper |
| |
|
|
| March |
5 |
Check 3: Revised floor plan on trash paper at 1/8" (show walls/doors/corridors) |
| |
|
Check 4: Concept statement |
| |
|
TIP: Begin ordering finish samples and selecting furniture |
| |
|
|
| |
7 |
Codes Visual Guide Due by 5:00 (200 points) |
| |
|
In class work day - Work on final floor plan |
| |
|
|
| |
12 |
No Class: Spring Break (work on floor plan) |
| |
14 |
No Class: Spring Break (work on floor plan) |
| |
|
|
| |
19 |
Check 5: Final Floor Plan on CAD (with doors, windows, etc.) printed at 11x17 |
| |
|
|
| |
21 |
Guest Speaker: Jill Bullard - Lighting and Lighting Controls (10 points) |
| |
|
Review: How to prepare a RCP |
| |
|
|
| |
26 |
Lecture: How to prepare a Raised Flooring Plan |
| |
|
Studio Time: Work on RCP |
| |
|
|
| |
28 |
Check 6: Reflected Ceiling Plan plotted on 11 x 17 |
| |
|
Check 7: Building Finishes (floors, walls, ceilings, laminates, etc.) |
| |
|
|
| April |
2 |
Check 8: Preliminary Spec Sheets |
| |
|
In class: work on raisded flooring plan/power/com |
| |
|
|
| |
4 |
Check 9: Raised Flooring Plan: Power/Com plotted on 11 x 17 |
| |
|
|
| |
9 |
Check 10: Remaining FF&E - photo quality images |
| |
|
|
| |
11 |
Individual Appointments - see door for signup times |
| |
|
|
| |
16 |
Individual Appointments - see door for signup times |
| |
|
|
| |
18 |
Check 11: Furniture Plan keyed with specs |
| |
|
Review for Exam 2 |
| |
|
|
| |
23 |
In class work Day - Review for Exam |
| |
|
|
| |
25 |
Exam 2: Commercial Terminology, Furniture, Raised Flooring, etc. (100 points) |
| |
|
Email Check 12: Perspective View by 5:00 p.m. |
| |
|
|
| |
30 |
Check 13: Details and 3 elevations |
| |
|
|
| May |
2 |
Professionalism Notebook Due (100 points) |
| |
|
Check 14: Review Digital Board layouts |
| |
|
|
| |
10 |
Project Due (350 points) |